MGI - Suleymaniyah, Northern Iraq - 500MW Power Plant Extension

Project Scope
GE Frame 9E (4x125 MW) and BOP Installation
Project Location
Sulaymaniyah / Northern Iraq
Project Year
2011 (Phase 1) - 2013 (Phase 2)
Client
ABB / Mass Global - MGI
Copyright © 2017 HAVATEK MAKİNA | All rights reserved.
Designed by Mavipiksel